Quote red flags: what actually inflates a price

Very few quotes are dishonest. Plenty are structured so you can't check them — one lump sum, a percentage fee with no basis, a discount that expires tonight. Here is the index of those patterns, by trade, with what each one hides and what to ask instead.

153 patterns

  • Plumbing quotes

    One lump sum for everything

    A single 'repair leak' line with no breakdown makes it impossible to tell whether you're paying for one hour or a full day.

    Full guide for this trade
  • Plumbing quotes

    Repair quietly upgraded to replacement

    Sometimes replacement really is the right call. But if you asked about a repair and got a replacement quote, ask directly what the repair would cost and why it was ruled out.

    Full guide for this trade
  • Plumbing quotes

    Emergency pricing on a non-emergency

    After-hours and emergency rates are legitimate. They should not be applied to work scheduled for next Tuesday.

    Full guide for this trade
  • Plumbing quotes

    Bundled 'while we're here' items

    Sometimes a genuine efficiency, sometimes padding. Ask which items are required now and which are recommended for later.

    Full guide for this trade
  • Plumbing quotes

    Percentage-based miscellaneous fees

    A percentage 'materials and supplies' or 'shop' fee applied on top of an already marked-up total compounds quickly.

    Full guide for this trade
  • Brake quotes

    Rotors replaced by default

    Some rotors must be replaced, and many shops replace as standard policy. Either way, ask whether yours are below minimum thickness — that's the measurable answer.

    Full guide for this trade
  • Brake quotes

    All four corners when one axle was the complaint

    Front and rear brakes wear at different rates. If the inspection only found wear on one axle, the estimate should reflect that.

    Full guide for this trade
  • Brake quotes

    Labour hours above book time

    Extra time can be legitimate on a seized or rusted assembly, but it should be named as such rather than silently billed.

    Full guide for this trade
  • Brake quotes

    Calipers added without a symptom

    Calipers are a large cost. Replacement should follow a specific finding — sticking, leaking, uneven wear — not appear as routine.

    Full guide for this trade
  • Brake quotes

    Bundled fluids and inspections

    Flushes and multi-point inspections are cheap individually and add up when several appear on one estimate.

    Full guide for this trade
  • Roof replacement quotes

    No square count

    Without a stated measurement, you cannot compare bids or check the material quantities against the price.

    Full guide for this trade
  • Roof replacement quotes

    Open-ended decking replacement

    'Bad wood replaced at additional cost' with no per-sheet rate is the most common way a roof price grows after work starts.

    Full guide for this trade
  • Roof replacement quotes

    Storm-chasing urgency

    Pressure to sign today, an insurance claim promised as a certainty, or a deposit demanded before any paperwork are all reasons to slow down.

    Full guide for this trade
  • Roof replacement quotes

    Full replacement for localised damage

    Sometimes correct, sometimes not. Ask specifically whether a repair or partial replacement was considered, and why it was ruled out.

    Full guide for this trade
  • Roof replacement quotes

    Upgrades presented as requirements

    Premium shingle lines and extended warranties are legitimate products. They should be a choice you made, not an assumption inside the number.

    Full guide for this trade
  • Roof replacement quotes

    A large deposit

    Some deposit is normal for material ordering. A large share of the total before any work begins is worth questioning, and in some places it's regulated.

    Full guide for this trade
  • Dental cleaning prices

    A deeper procedure billed as a cleaning

    If scaling and root planing was performed, ask what the periodontal findings — pocket depths — were that justified it, and whether a routine cleaning was an option.

    Full guide for this trade
  • Dental cleaning prices

    No codes on the statement

    A statement showing only a total and 'dental services' prevents you from checking anything against your plan.

    Full guide for this trade
  • Dental cleaning prices

    X-rays at every visit

    Sometimes clinically indicated, sometimes routine policy. Ask what interval is recommended for you specifically.

    Full guide for this trade
  • Dental cleaning prices

    Add-ons you weren't asked about

    Fluoride and screenings applied without a conversation, especially when your plan doesn't cover them at your age.

    Full guide for this trade
  • Dental cleaning prices

    A cleaning that exceeded your plan's frequency limit

    The clinic may not have checked. This turns a routine covered visit into a full out-of-pocket one.

    Full guide for this trade
  • Dental cleaning prices

    Out-of-network billing

    Out-of-network clinics bill their full fee rather than a negotiated rate, so the same codes cost you more.

    Full guide for this trade
  • Water heater quotes

    One number, no equipment/labour split

    Without the split you can't tell whether you're paying for a premium unit or premium labour.

    Full guide for this trade
  • Water heater quotes

    No model number

    The unit is the one component with a verifiable market price. A quote that won't name it removes your only hard reference point.

    Full guide for this trade
  • Water heater quotes

    Urgency pricing on a working heater

    A failed heater with active leaking is an emergency. A heater that's simply old is not, and you have time to get a second quote.

    Full guide for this trade
  • Water heater quotes

    Code upgrades not identified as such

    Legitimate items, but you're entitled to know which are legally required and which are the installer's preference.

    Full guide for this trade
  • Water heater quotes

    Tankless quoted without the conversion costs explained

    If the gas line, venting or electrical work is what makes tankless expensive, that should be visible so you can judge the upgrade on its merits.

    Full guide for this trade
  • Water heater quotes

    Extended warranties folded into the total

    Sometimes worthwhile, but it should be a line you can decline.

    Full guide for this trade
  • Window replacement quotes

    One project total with no per-window pricing

    This is the single biggest obstacle to comparing window quotes, and the easiest thing to ask for.

    Full guide for this trade
  • Window replacement quotes

    Same-day discount pressure

    A price that's only available if you sign tonight is a sales tactic, not a market price. Any legitimate quote will still be honoured next week.

    Full guide for this trade
  • Window replacement quotes

    Full-frame quoted where insert would do

    Full-frame is sometimes essential. If your frames are sound, ask what insert replacement would cost instead.

    Full guide for this trade
  • Window replacement quotes

    Glass package upgraded silently

    Triple glazing or premium coatings may be the right choice, but you should be able to see the price difference and decline.

    Full guide for this trade
  • Window replacement quotes

    Trim and capping excluded but not mentioned

    Discovered after installation, this becomes an unavoidable extra at the contractor's price.

    Full guide for this trade
  • Window replacement quotes

    A 'lifetime' warranty with no written terms

    Ask what's covered, for how long, whether labour is included, and whether it transfers.

    Full guide for this trade
  • Electrical quotes

    'Electrical work' as a single line

    No labour basis, no device list, no run description — nothing to evaluate.

    Full guide for this trade
  • Electrical quotes

    A panel upgrade appearing without justification

    Sometimes genuinely required by capacity or an unsafe panel type. It should be explained in terms of your specific panel, not offered as routine.

    Full guide for this trade
  • Electrical quotes

    Safety-framed urgency

    Real hazards exist and should be fixed. But 'this could burn your house down' with no specific finding written down is a pressure tactic.

    Full guide for this trade
  • Electrical quotes

    Percentage materials or shop fees

    A percentage added to an already marked-up total on a labour-dominated job adds up quickly.

    Full guide for this trade
  • Electrical quotes

    Patching excluded silently

    If drywall repair isn't included, you'll be hiring that separately — better to know before you approve.

    Full guide for this trade
  • Electrical quotes

    Permit fee marked up without saying so

    Filing a permit takes time and can fairly be charged for. It should just be visible as such.

    Full guide for this trade
  • Internet bill increases

    An expired promotional rate

    By far the most common cause. The bill didn't change unfairly — the discount simply ended on schedule.

    Full guide for this trade
  • Internet bill increases

    Long-running equipment rental

    Charged every month for years on hardware that often costs less to buy outright.

    Full guide for this trade
  • Internet bill increases

    Add-ons nobody uses

    Phone lines, TV tiers and receivers that were bundled at signup and never cancelled.

    Full guide for this trade
  • Internet bill increases

    Fees that sound governmental

    Names resembling regulatory charges, listed alongside real taxes, but set by the provider.

    Full guide for this trade
  • Internet bill increases

    Automatic annual increases

    Some contracts allow a yearly rise. Legal, and worth knowing about before you renew.

    Full guide for this trade
  • Internet bill increases

    A speed tier beyond your needs

    Upgrades sold on peace of mind rather than usage. Most households need far less than the top tiers.

    Full guide for this trade
  • HVAC and AC quotes

    Good/better/best sheets with no model numbers

    Three tiers on one page with round numbers and no model numbers means you cannot price-check any of them, which is usually the point.

    Full guide for this trade
  • HVAC and AC quotes

    Same-day discount that expires tonight

    Legitimate seasonal promotions exist and last weeks. A discount that dies when the salesperson leaves your kitchen is a pressure tactic, not a price.

    Full guide for this trade
  • HVAC and AC quotes

    Full system sold on a failed part

    A dead capacitor or contactor is a cheap fix. If a repair visit turns into a replacement quote, ask what the repair costs and how long the existing system is expected to last with it.

    Full guide for this trade
  • HVAC and AC quotes

    Efficiency upsell without a payback number

    Ask what the annual saving is expected to be and how many years to pay back the difference. If nobody can tell you, the upgrade is being sold on feeling.

    Full guide for this trade
  • HVAC and AC quotes

    Financing quoted instead of price

    A monthly payment is not a price. Get the cash total, then decide about financing separately.

    Full guide for this trade
  • Mechanic estimates

    Bundled maintenance presented as the repair

    Fluid flushes, filters and 'recommended services' attached to a repair estimate are separate decisions. Ask for them as a separate line so you can decline without changing the repair.

    Full guide for this trade
  • Mechanic estimates

    Full book time on overlapping jobs

    If two of the quoted operations require the same parts removed, ask whether the labour overlap has been credited.

    Full guide for this trade
  • Mechanic estimates

    Parts swapped on suspicion

    Replacing a sequence of parts to chase a fault charges you for the diagnosis. Ask what test confirmed the failed component.

    Full guide for this trade
  • Mechanic estimates

    Safety framing on a maintenance item

    Some items genuinely are urgent. Ask what happens if you wait a month, and whether the answer is 'it fails' or 'it gets worse slowly'.

    Full guide for this trade
  • Mechanic estimates

    Estimate given verbally only

    A number said out loud can drift by the time the invoice prints. Ask for the estimate in writing before work begins.

    Full guide for this trade
  • Medical bills

    A summary bill instead of an itemised one

    'Hospital services — one line' cannot be checked by anyone. An itemised bill with codes is something you're generally entitled to ask for.

    Full guide for this trade
  • Medical bills

    Duplicate charges

    The same code appearing twice for one service, or a supply billed both individually and as part of a bundle.

    Full guide for this trade
  • Medical bills

    Unbundling

    Services that should be billed together as one code, split into several charged separately.

    Full guide for this trade
  • Medical bills

    A bill that arrives before the insurer has processed

    Paying a first bill that hasn't been through insurance can mean paying list price. Match every bill against an explanation of benefits first.

    Full guide for this trade
  • Medical bills

    Quantity errors

    A decimal or unit error — 10 units of a medication instead of one — is mundane, common, and expensive.

    Full guide for this trade
  • Moving quotes

    A quote given over the phone with no survey

    A number produced without seeing or listing your belongings is a guess, and guesses adjust upward on moving day.

    Full guide for this trade
  • Moving quotes

    Deposit demands out of proportion

    A modest deposit is normal. A large cash deposit before any inventory or paperwork is a warning sign.

    Full guide for this trade
  • Moving quotes

    Surcharges appearing at the truck

    Long carry, stairs and shuttle fees charged on the day, when they were visible at the address all along.

    Full guide for this trade
  • Moving quotes

    Coverage sold as insurance

    If cover is presented as though your belongings are fully protected, ask for the per-pound figure and the deductible in writing.

    Full guide for this trade
  • Moving quotes

    Broker in the middle

    Some 'movers' sell your job on to a carrier you've never spoken to. Ask directly whether they are the carrier performing the move.

    Full guide for this trade
  • Garage door quotes

    A spring failure turned into a whole new door

    Sometimes the door really is at end of life. But if you called about a spring, ask directly what the spring repair alone would cost and why it was ruled out.

    Full guide for this trade
  • Garage door quotes

    Openers bundled in without being asked for

    A working opener does not need replacing because the door was serviced. Ask which items are required and which are optional.

    Full guide for this trade
  • Garage door quotes

    Emergency rates on a routine visit

    After-hours pricing is legitimate for a car trapped inside. It should not appear on a visit scheduled for next week.

    Full guide for this trade
  • Garage door quotes

    Unnamed parts

    'Hardware and rollers' can mean a handful of nylon rollers or a full track rebuild. Ask for the item list.

    Full guide for this trade
  • Garage door quotes

    Percentage-based shop or materials fees

    A percentage added on top of already marked-up parts compounds fast and rarely reflects a real cost.

    Full guide for this trade
  • Water softener quotes

    Today-only pricing

    A discount that expires when the salesperson leaves your kitchen is a sales technique, not a market price. Any legitimate quote survives a night's sleep.

    Full guide for this trade
  • Water softener quotes

    A dramatic in-home water test

    Precipitate demonstrations look alarming and prove very little. Ask for hardness in grains per gallon and iron in parts per million, in writing.

    Full guide for this trade
  • Water softener quotes

    Oversized systems

    A system far larger than your household and hardness require costs more up front and regenerates inefficiently.

    Full guide for this trade
  • Water softener quotes

    Bundled treatment you didn't ask about

    Softening, iron removal, sediment filtration and drinking-water RO solve different problems. You may need one, not all four.

    Full guide for this trade
  • Water softener quotes

    Financing presented as the price

    A monthly figure hides the total. Ask for the cash price, the term, and the total amount payable.

    Full guide for this trade
  • Tree removal quotes

    Storm-response urgency

    Emergency work after a storm genuinely costs more. It shouldn't be applied to a tree that has been leaning for three years.

    Full guide for this trade
  • Tree removal quotes

    Door-knocking crews

    A crew already 'working in the neighbourhood' with a discount for today is the oldest pitch in the trade, and often the least insured.

    Full guide for this trade
  • Tree removal quotes

    Stump grinding assumed, not quoted

    A quote that quietly excludes the stump looks cheaper until you get a second bill to remove it.

    Full guide for this trade
  • Tree removal quotes

    Extra trees added to the scope

    Package pricing on several trees can be a real saving, or it can be three trees you never planned to remove.

    Full guide for this trade
  • Tree removal quotes

    Vague 'clean-up' language

    Ask specifically whether chips, logs, brush and raking are all included.

    Full guide for this trade
  • Gutter quotes

    Gutter guards sold as part of the job

    Guards can be worthwhile, but they are an add-on with a wide price range. They belong on their own line so you can accept or decline them.

    Full guide for this trade
  • Gutter quotes

    High-pressure guard demonstrations

    Lifetime-guarantee guard products are often sold at several times the price of the gutters themselves, with same-day pricing. Treat it as a separate purchase decision.

    Full guide for this trade
  • Gutter quotes

    No measurement given

    Without linear feet you cannot compare bids or check the per-foot rate against anything.

    Full guide for this trade
  • Gutter quotes

    Fascia repair discovered mid-job

    Sometimes genuine. It should still be quoted per foot up front as a contingency rather than open-ended.

    Full guide for this trade
  • Gutter quotes

    Two-storey work priced as an afterthought

    Height legitimately costs more. It should be stated in the quote, not added later.

    Full guide for this trade
  • Pest control quotes

    A long contract behind a cheap first visit

    A very low initial treatment can be an entry point to a multi-year agreement. Ask for the total cost over the full term.

    Full guide for this trade
  • Pest control quotes

    Whole-home treatment for a localised problem

    One wasp nest is not a whole-property programme. Ask what the targeted option costs.

    Full guide for this trade
  • Pest control quotes

    Termite or 'structural risk' urgency

    Termites are serious and worth acting on. Urgency language still shouldn't prevent you getting a second inspection.

    Full guide for this trade
  • Pest control quotes

    Exclusion excluded

    Repeated treatments without sealing entry points can turn a fixable problem into a permanent subscription.

    Full guide for this trade
  • Pest control quotes

    Auto-renewal and cancellation fees

    These are contract terms, not pricing, and they're where the real cost of a cheap quote often sits.

    Full guide for this trade
  • Towing bills

    An unsolicited tow from a scene

    A truck that arrives without being called by you or your insurer, and tows to its own lot, is a classic predatory pattern. You may have rights to challenge the charge.

    Full guide for this trade
  • Towing bills

    Storage running while you dispute the bill

    Every day in their lot is added to what you owe. Resolving the dispute quickly, or retrieving the vehicle, is often cheaper than fighting it from storage.

    Full guide for this trade
  • Towing bills

    Inflated mileage to a preferred yard

    The destination yard matters. A long tow to the company's own lot, when a closer one was available, inflates both mileage and storage.

    Full guide for this trade
  • Towing bills

    Recovery charged without recovery work

    If the vehicle was parked, not stuck, a winch or recovery line should not appear.

    Full guide for this trade
  • Towing bills

    Administrative or 'clean-up' fees

    Percentage or flat admin fees added on top of real charges are worth questioning, especially after an accident.

    Full guide for this trade
  • Transmission quotes

    A rebuild quoted without a diagnosis

    A major recommendation should follow a documented diagnosis, not a single scan code. Ask what was physically found.

    Full guide for this trade
  • Transmission quotes

    Fluid flush sold as a fix

    A flush can help some units and harm others. It is maintenance, not a repair for internal failure.

    Full guide for this trade
  • Transmission quotes

    New unit when a rebuild or reman would do

    A new factory unit is the most expensive option and is rarely the only one. Ask for all three priced.

    Full guide for this trade
  • Transmission quotes

    Solenoid or valve body work bundled into a rebuild

    If the fault is in a solenoid or valve body, that's a targeted repair at a fraction of a rebuild.

    Full guide for this trade
  • Transmission quotes

    Vague warranty language

    A transmission warranty has real value and real limits. Ask what's covered, for how long, and whether it's the shop or the unit manufacturer.

    Full guide for this trade
  • Appliance repair quotes

    A diagnostic that finds nothing

    If the unit works fine in the shop, ask whether the diagnostic fee still applies and what the next step is. A fee for 'couldn't reproduce' should be small.

    Full guide for this trade
  • Appliance repair quotes

    Parts without model numbers

    'Control board' tells you nothing. Without a part number you cannot check the markup or confirm it's the right board.

    Full guide for this trade
  • Appliance repair quotes

    Board replacement without a confirmed fault

    Control boards are expensive and sometimes replaced by trial. Ask what fault was confirmed before the board was ordered.

    Full guide for this trade
  • Appliance repair quotes

    Labour inflated above book time

    Flat-rate book times exist for appliance tasks. Extra time can be legitimate on a difficult install, but should be named.

    Full guide for this trade
  • Appliance repair quotes

    Repeat visits billed separately

    If a part was misdiagnosed, a second visit shouldn't be a new charge. Ask how callbacks are handled.

    Full guide for this trade
  • Locksmith bills

    Phone-quote bait

    A very low quote on the phone that becomes a much higher bill on site, justified only after the work is done, is the classic predatory locksmith pattern.

    Full guide for this trade
  • Locksmith bills

    Drilling when picking would do

    Some locks must be drilled, but drilling also creates a new-lock sale. Ask whether non-destructive entry was attempted first.

    Full guide for this trade
  • Locksmith bills

    Inflated after-hours or 'emergency' fees

    A premium is fair for a 2 a.m. callout. It should be disclosed on the phone, and it should not apply to a midday appointment.

    Full guide for this trade
  • Locksmith bills

    Extra charges invented after the work

    A bill that adds lines not quoted on the phone is the core warning sign. Ask for the quoted total in writing before any work starts.

    Full guide for this trade
  • Locksmith bills

    Cash-only, no receipt

    A refusal to provide an itemised receipt is a red flag, not a convenience.

    Full guide for this trade
  • Painting quotes

    No prep described

    If the quote doesn't mention prep, it's either being skipped or folded into a round number. Either way you can't judge the job.

    Full guide for this trade
  • Painting quotes

    One coat over a colour change

    Going from dark to light (or vice versa) usually needs a prime coat plus two finish coats. One coat won't cover cleanly.

    Full guide for this trade
  • Painting quotes

    Premium paint with budget labour

    Named premium paint is a good sign only if the prep and coats match. A premium product over poor prep fails regardless.

    Full guide for this trade
  • Painting quotes

    Repairs discovered mid-job

    Some drywall damage is genuinely hidden. But a pattern of mid-job discoveries suggests the quote skipped inspection.

    Full guide for this trade
  • Painting quotes

    Vague 'supplies' or 'materials' fees

    A percentage or flat 'supplies' line on top of named paint and labour should be questioned.

    Full guide for this trade
  • Bathroom remodels

    Moving plumbing you didn't need moved

    Relocating the toilet or shower drain can add a large amount of labour and risk. Sometimes it's worth it for the layout. Ask what the price would be keeping the current locations, so you can see what the change actually costs.

    Full guide for this trade
  • Bathroom remodels

    Tub-to-curbless-shower conversions

    A zero-threshold shower usually means altering the floor structure and drainage. It's a genuinely bigger job than it sounds, and it's often the hidden reason one quote is thousands higher.

    Full guide for this trade
  • Bathroom remodels

    Tile choices that are slow to install

    Mosaic, herringbone, large-format and stone all raise labour hours, not just material cost. The same budget tile in a complex pattern can cost more installed than a premium tile laid straight.

    Full guide for this trade
  • Bathroom remodels

    Vague allowances

    A fixture or tile allowance set low makes a quote look competitive and guarantees an overage once you actually choose things. Ask what the allowance buys and what happens if you exceed it.

    Full guide for this trade
  • Bathroom remodels

    Unknowns priced as certainties

    Nobody knows what's behind a 30-year-old shower wall. A quote that ignores that will change; a quote that names it and sets a contingency is being straight with you.

    Full guide for this trade
  • Bathroom remodels

    Timeline compression

    Squeezing several trades into a short window costs more to coordinate, and a rushed waterproofing or tile job is the one you'll notice for years.

    Full guide for this trade
  • Dental work costs

    One treatment-plan total with no codes

    Without procedure codes, tooth numbers and individual fees, neither you nor another office can compare the proposed work accurately.

    Full guide for this trade
  • Dental work costs

    Insurance shown as guaranteed

    A benefit estimate can change when the insurer processes the claim. The document should distinguish an expected payment from a confirmed payment.

    Full guide for this trade
  • Dental work costs

    Optional upgrades mixed into required treatment

    Material upgrades, whitening and other elective items should be separate choices, not buried in the treatment required to address the stated problem.

    Full guide for this trade
  • Dental work costs

    Several phases presented as immediately urgent

    Some findings genuinely need prompt care. Ask which treatment is urgent, which prevents further damage and which can be scheduled later, with the clinical reason for each.

    Full guide for this trade
  • Dental work costs

    Out-of-network assumptions

    If the office is outside your network, the plan may reimburse from a lower allowed amount and leave you the difference. Confirm network status for both the clinic and any specialist.

    Full guide for this trade
  • Dog ACL surgery cost

    Single total for 'knee surgery'

    Ask for the technique and itemised costs.

    Full guide for this trade
  • Dog ACL surgery cost

    Follow-up not included

    Recheck X-rays and visits can add up later.

    Full guide for this trade
  • Dog ACL surgery cost

    Both knees assumed

    Ask whether the estimate covers one or both legs.

    Full guide for this trade
  • Dog ACL surgery cost

    No explanation of alternatives

    Ask about other techniques or conservative management.

    Full guide for this trade
  • Dog dental cleaning cost

    Low base price without anesthesia details

    Ask what is included.

    Full guide for this trade
  • Dog dental cleaning cost

    Extractions unpriced

    Ask for per-tooth ranges in advance.

    Full guide for this trade
  • Dog dental cleaning cost

    No approval process

    Agree on a spending limit and contact method.

    Full guide for this trade
  • Dental implant cost

    Headline price for the post only

    Ask for abutment and crown costs.

    Full guide for this trade
  • Dental implant cost

    Grafting added later

    Ask whether imaging shows graft is needed.

    Full guide for this trade
  • Dental implant cost

    Full-mouth plans without itemization

    Ask for per-arch and per-component pricing.

    Full guide for this trade
  • Head gasket repair cost

    No diagnostic proof

    Ask for the test results.

    Full guide for this trade
  • Head gasket repair cost

    Bundled extras without explanation

    Ask which extras are recommended and why.

    Full guide for this trade
  • Head gasket repair cost

    Labour above book time

    Ask what time guide is used.

    Full guide for this trade
  • Cremation cost

    Packages without itemization

    Ask for the General Price List.

    Full guide for this trade
  • Cremation cost

    Expensive urns presented as required

    You can supply your own.

    Full guide for this trade
  • Cremation cost

    Embalming suggested for direct cremation

    It is generally not required for direct cremation.

    Full guide for this trade
  • Root canal cost

    Crown left off the quote

    Root canal priced alone, with the crown arriving as a second surprise.

    Full guide for this trade
  • Root canal cost

    Retreatment

    Redoing an old root canal is more complex and costs more.

    Full guide for this trade
  • Root canal cost

    Specialist referral

    Endodontists typically charge more — sometimes worth it for difficult teeth.

    Full guide for this trade
  • Root canal cost

    Premium crown upsell

    High-end crown materials without explaining the options.

    Full guide for this trade
  • Root canal cost

    Sedation add-ons

    Sedation included without asking.

    Full guide for this trade
  • Timing belt replacement cost

    Chain engines quoted for a belt

    Paying for a service your engine doesn't need.

    Full guide for this trade
  • Timing belt replacement cost

    Belt-only bids

    Cheap quote that skips the water pump, leading to paying labour twice later.

    Full guide for this trade
  • Timing belt replacement cost

    Labour above book time

    Hours higher than published estimates without explanation.

    Full guide for this trade
  • Timing belt replacement cost

    Unneeded add-ons

    Fluid flushes unrelated to the job bundled in.

    Full guide for this trade
  • Timing belt replacement cost

    Unbranded parts

    Low-quality kits on a job where failure can damage the engine.

    Full guide for this trade

Have a quote in front of you?

We'll read it and tell you which of these patterns it contains — in plain English.

Check your quote

A red flag is a reason to ask a question, not proof of wrongdoing. Educational information only — see our disclaimer.